RIYADH METRO

Independent checking of ground support and structural capacity of tunnel lining for the bored running tunnels forming the Riyadh Metro.  

 

BANK STATION CAPACITY UPGRADE

Independent checking of all shafts and tunnels forming this new enlarged bored tunnel station complex, including both temporary and permanent works.

 

SANTIAGO METRO, CHILE

Independent review, audit and approval of local permanent and temporary SCL tunnel designs for stations and running tunnels.  

 

GREEN PARK STEP-FREE ACCESS

Independent category III check of new elliptical lift shaft, lift lobby and connection tunnels formed from SCL.  

 

SHIELDHALL TUNNEL, SCOTLAND

Gateway review and independent cost and programme estimates for Scotland’s largest waste water tunnel at 5km long and 4.7m in diameter.

 

 

 

 

 

Project and design assurance.

We provide objective assurance
at widely varying levels from individual structure or facility stability, serviceability and compliance for both permanent and temporary works through to strategic assessments of project and delivery maturity for entire major infrastructure schemes.

© 2018 OTB Engineering - Extraordinary Ingenuity

LONDON

46 Loman Street

London SE1 0EH

T: 0207 099 2608

E: dpage@otbeng.com

NORTHERN

Unit 5, Brunel Court

Rudheath Way

Northwich CW9 7LP

T: 0160 653 7244

E: sjbeauchamp@otbeng.com